|
|
|
|
|
|
Furlong Water Supply System
Well #6 and #7
Project Engineer: Castle Valley Consultants
Township Engineer: Castle Valley Consultants
Wells #6 and #7 were constructed to supply a new residential community as well as to increase water supply and pressure to existing homes within the Township. The project included the construction of two new supply wells, a 100,000 gallon above grade storage tank, control building, booster pumps, chemical feed systems, and SCADA systems. All site work, detension basins, paving and fencing were also included in MGK's scope of work.
|
|
|
|
|
|
|
|